Benchmarking Dimensionality Reduction: The Epistemology of Embeddings#
This example demonstrates the “Advanced Exploration and Benchmarking” pillar of the
coco_pipe strategic vision. We move beyond “looking good” and use rigorous
metrics (Trustworthiness, Continuity, LCMC) to quantify embedding distortion.
We compare PCA (Linear) and UMAP (Non-linear) on the classic “S-Curve” manifold, a structure that is inherently 2D but embedded in 3D.
Imports#
import os
import matplotlib.pyplot as plt
from sklearn.datasets import make_s_curve
from coco_pipe.dim_reduction import DimReduction
from coco_pipe.viz.dim_reduction import plot_embedding
# Prevent multiprocessing segfaults on macOS by limiting threads
os.environ["OMP_NUM_THREADS"] = "1"
os.environ["LOKY_MAX_CPU_COUNT"] = "1"
os.environ["NUMEXPR_MAX_THREADS"] = "1"
1. Generate Ground Truth Manifold#
The S-Curve is a standard benchmark. It has intrinsic dimension 2. We generate 1000 points.
n_points = 1000
X, color = make_s_curve(n_points, random_state=42)
# Visualize Ground Truth using our viz module in 3D
fig, ax = plot_embedding(
X,
labels=color,
dims=(0, 1, 2),
title="Ground Truth: S-Curve Manifold",
cmap="viridis",
label_kind="continuous",
s=20,
)
ax.view_init(10, -70)
plt.show()

2. Compare Embeddings#
We will embed this 3D data into 2D using PCA and UMAP, then quantify the distortion.
# Initialize Reducers
reducers = {
"PCA": DimReduction("PCA", n_components=2),
"UMAP": DimReduction("UMAP", n_components=2, n_neighbors=15, min_dist=0.1),
}
results = {}
for name, dr in reducers.items():
print(f"Running {name}...")
X_emb = dr.fit_transform(X)
# Calculate Metrics
# Note: These metrics are calculated via scikit-learn or internal utils
# For this demo, we assume they are computed and stored in the 'scores'
scores = dr.score(X_emb, X=X)
results[name] = {"embedding": X_emb, "scores": scores}
Running PCA...
Running UMAP...
3. Visualize and Quantify#
We plot the 2D embeddings side-by-side with their Trustworthiness scores.
Trustworthiness: High means neighbors in 2D are real neighbors in 3D (No spurious clusters).
Continuity: High means 3D neighbors are preserved in 2D (No tearing).
fig, axes = plt.subplots(1, 2, figsize=(14, 6))
for i, (name, res) in enumerate(results.items()):
X_emb = res["embedding"]
scores = res["scores"]
# Extract metrics from the structured payload
m = scores.get("metrics", {})
trust = m.get("trustworthiness", 0.0)
cont = m.get("continuity", 0.0)
lcmc = m.get("lcmc", 0.0)
ax = axes[i]
title = f"{name}\n"
title += f"Trustworthiness: {trust:.3f}\n"
title += f"Continuity: {cont:.3f}\n"
title += f"LCMC: {lcmc:.3f}"
# Use the coco_pipe plotting function
plot_embedding(
X_emb,
labels=color,
title=title,
cmap="viridis",
label_kind="continuous",
s=20,
alpha=0.7,
ax=ax,
)
ax.axis("tight")
ax.set_xticks([])
ax.set_yticks([])
plt.tight_layout()
plt.show()

Interpretation#
PCA: Should have high Continuity (it folds the S-curve onto itself, keeping neighbors together) but lower Trustworthiness (distant points overlap in the projection, creating false neighbors).
UMAP: Should have high Trustworthiness and Continuity as it unrolls the manifold, preserving the local neighborhood structure without determining false overlaps.
This quantitative assessment is superior to simply saying “UMAP looks better.”
Total running time of the script: (0 minutes 1.528 seconds)